Type Here to Get Search Results !

Result SLET February 2021 Download sheet in the below link

Result SLET February 2021 Download sheet in the below link

This is notified that the following Roll Nos. appeared in SET, 2021 (held on 14-02-2021) are declared pass in the Test and are Eligible for Lectureship in Colleges and Universities of N. E. States including Sikkim. 

The criteria adopted during the finalisation of the result is as follows: It has been decided by the UGC that 6% of the appearing candidates should be declared qualified for Eligibility for Assistant Professors.

 i) In order to be considered for eligibility for Assistant Professor, the candidates must have appeared in two papers and secured at least 40% aggregate marks in two papers taken togther for General & EWS Category

candidates and at least 35% aggregate marks in two papers taken together for all Candidates belonging to reserved categories,

viz - SC, ST, OBC (belonging to Non Creamy Layer) and PWD 

 ii) The calculation is based on the ratio of number of candidates who secure minimum aggregate percentage of marks as prescribed in (i) above in each subject category-wise to the total number of candidates of that category over all subjects fulfilling (i) above multiplied by the total number of slots to be awarded to that category. The nearest whole number obtained as per this formula-provides the number of slots available in any particular subject category-wise.


 iii) By this method, if the number of slots obtained is less than one, it is taken as one, i.e. a minimum of one slot is awarded wherever a fractions less then one is obtained as per the calculation. However for fractions greater than one, the figure is rounded off to the nrearest whole number


iv) The aggregate percentage of all the two papers corresponding to the number of slots derived as per the previous paragraph taken as the cut-off qualifying percentage marks for a particular subject category-wise 

Download the SLET Result Sheet 2021 Feb

http://sletne.org/wp-content/uploads/2021/07/resultsheet_14-2-21.pdf 

Post a Comment

0 Comments

Projects